Bang for your buck in the Pilbara!
For this build, our client required 370,000lt of bulk water storage to supply 6,000 native trees at Nelson Point, Port Hedland.
Watertorque mobilised crew from our Muchea and Broome branches to supply and install a Cyclonic Region D Pioneer XL50 3-ring tank in Pale Eucalypt. This tank was selected for the best balance between size and cost per kL of water storage.
The Jacking system utilised allows the tank to be built layer-by-layer from the ground, contributing to a safe and efficient work site by minimising time spent working at heights.
If you have a unique tank requirement, please contact Watertorque for solutions and options.